A review on sediment erosion in hydro turbines

Document Type : Review Article

Authors

1 New Energies Research and Technology Office, Renewable Energy Organization of Iran (SUNA), Tehran, Iran

2 Rural Electricity & Energy Office (Photovoltaic), Renewable Energy Organization of Iran (SUNA), Tehran, Iran

Abstract

Hydropower plays an important role in electricity generation and due to high cost of developing a hydropower plant, running at maximum efficiency is essential during its lifetime. Sediment erosion which is caused by the dynamic action of silt flowing along with water, impacting against a solid surface is one reasons of declining performance and efficiency of hydro powers over time. Sediment erosion in hydro turbines is a complex phenomenon and there is no precise mathematical model for its description. Generally sediment erosion in hydro turbines depends on properties of particles, properties of base material and operating condition. There are a lot of studies that are aim to identify effective parameters of silt erosion in hydro turbines which most of them are based on experimental data. In this paper a review of studies on erosion theory, sediment erosion models and methods of sediment erosion prevention in hydro turbines has been discussed.

Keywords


[1]     World Energy Resources; Charting the Upsurge in Hydropower Development, World Energy Council2015.
[2]     D. O. Pradhan PMS, Joshi PN, Stole H, Sediment and efficiency measurements at Jhimruk hydropower plant—monsoon 2003, HydroLab, Nepal, 2004.
[3]     G. Truscott, A literature survey on abrasive wear in hydraulic machinery, Wear, vol. 20, pp. 29-50, 1972.
[4]     N. Tsuguo, Estimation of repair cycle of turbine due to abrasion caused by suspended sand and determination of desilting basin capacity, in Proceedings of international seminar on sediment handling technique, NHA, Kathmandu, 1999.
[5]     B. Thapa,  Sand erosion in hydraulic machinery, 2004.
[6]     B. A. G. Chauhan and D. Verma, Determitaion of optimal sediment size to be excluded for run-of-river projects—a case study, Silting Problems in Hydropower Plants, p. 206, 2002.
[7]     H. Brekke, W. Wu, and B. Cai, Design of hydraulic machinery working in sand laden water, Abrasive erosion & corrosion of hydraulic machinery, pp. 156-171, 2002.
[8]     H. P. Neopane, Sediment erosion in hydro turbines, Faculty of Engineering Science and Technology, Norwegian University of Science and Technology, 2010.
[9]     H. P. Neopane, O. G. Dahlhaug, and B. Thapa, An investigation of the effect of particle shape and size in hydraulic turbines, in Waterpower XVI 09, 2009.
[10]   T. Bajracharya, B. Acharya, C. Joshi, R. Saini, and O. Dahlhaug, Sand erosion of Pelton turbine nozzles and buckets: a case study of Chilime hydropower plant, Wear, vol. 264, pp. 177-184, 2008.
[11]   M. Padhy and R. Saini, Effect of size and concentration of silt particles on erosion of Pelton turbine buckets, Energy, vol. 34, pp. 1477-1483, 2009.
[12]   M. Padhy and R. Saini, Study of silt erosion on performance of a Pelton turbine, Energy, vol. 36, pp. 141-147, 2011.
[13]   T. Takagi, T. Okamura, and J. Sato, Hydraulic performance of a Francis-turbine for sediment-laden flow, Hitachi review, vol. 37, pp. 115-120, 1988.
[14]   B. Thapa, P. Upadhyay, O. G. Dahlhaug, M. Timsina, and R. Basnet, HVOF coatings for erosion resistance of hydraulic turbines: Experience of Kaligandaki-A Hydropower Plant, Water resources and renewable energy development in Asia, Danang, Vietnam, 2008.
[15]   M. Bishwakarma and H. Støle, Real-time sediment monitoring in hydropower plants, Journal of Hydraulic Research, vol. 46, pp. 282-288, 2008.