Technical and Economic Analysis of Rooftop Photovoltaic Systems in a Research Center: A Case Study of the Research Institute of Petroleum Industry (RIPI), Iran

Document Type : Original Article

Authors

1 Ph.D. in Energy Systems Engineering – Energy Modeling, Senior Energy Technology Specialist, Energy Management and Engineering Services Department, Research Institute of Petroleum Industry (RIPI), Tehran, Iran

2 M.Sc. in Mechanical Engineering – Energy Conversion, Head of Energy Management Group, Engineering and Technical Services Management, Research Institute of Petroleum Industry (RIPI), Tehran, Iran

3 Ph.D. in Electrical Engineering, Head of Engineering and Technical Services Unit, Research Institute of Petroleum Industry (RIPI), Tehran, Iran

Abstract
Abstract

In line with the legal requirements for renewable energy development in public institutions, the Research Institute of Petroleum Industry (RIPI) of Iran conducted a techno-economic assessment of photovoltaic (PV) systems on two selected sites: the conference hall roof and the swimming pool complex roof. Using PV*SOL Premium 2024 and actual electricity consumption data, the total installed capacity was estimated at approximately 752 kWp, capable of supplying about 17% of the organization's electricity demand, aligning with the government-approved 20% renewable target. Simulation results indicate a performance ratio (PR) of 91.51% for the swimming pool roof and 74.66% for the conference hall roof, with a total annual energy production of around 1,197 MWh. Economically, the payback period ranges from 8.5 to 12.5 years, and the internal rate of return (IRR) is 38.03% and 30.28%, respectively. Considering 1% annual O&M costs and a 0.5% degradation rate, the financial feasibility of the projects is confirmed. Key performance indicators such as PR and energy production align with clauses 6.3 and 9.1 of ISO 50001. This study, by integrating real consumption data with detailed techno-economic simulations, provides a practical example of PV system assessment in institutional buildings in Iran.

Keywords

Subjects


Articles in Press, Accepted Manuscript
Available Online from 27 November 2026

  • Receive Date 11 October 2025
  • Revise Date 16 September 2026
  • Accept Date 17 October 2026