Abstract
In this study, the techno-economic performance of an integrated Combined Heat and Power–Concentrated Photovoltaic Thermal–Multi-Effect Desalination (CHP–CPVT–MED) system was investigated under hot and dry climatic conditions. A detailed thermodynamic model was developed to simulate annual system operation, and the Levelized Cost of Water (LCOW) was selected as the single objective function for economic evaluation and optimization. The results indicate that the CPVT field can supply up to 25% of the MED thermal demand during peak summer months, with an annual average solar contribution of approximately 21%. Integration of the solar thermal field reduced annual fuel consumption by nearly 3% compared to the reference CHP–MED configuration. Under baseline economic assumptions, LCOW decreased from 2.12 to 2.02 $/m³, corresponding to a 4.7% economic improvement. Sensitivity analysis revealed that fuel price is the most influential parameter affecting economic viability, while higher discount rates diminish the attractiveness of solar integration. Furthermore, optimization of the CPVT field area demonstrated a non-linear relationship between capital investment and operational savings, identifying an optimal collector area that minimizes LCOW. The findings suggest that hybridization of CHP-driven desalination systems with CPVT technology can enhance fuel savings and economic performance in high-irradiance regions, provided that economic boundary conditions remain favorable.

Keywords

Subjects


Articles in Press, Accepted Manuscript
Available Online from 17 November 2026

  • Receive Date 31 May 2025
  • Revise Date 25 February 2026
  • Accept Date 14 September 2026